FN Diving successfully completed an underwater PBCF ECO CAP installation in the Port of Tarragona, Spain, within just 48 hours. Our specialized commercial diving team travelled from the Netherlands to Spain, while all required equipment and installation materials were mobilized from our Rotterdam facilities. The existing propeller boss cap was removed and replaced with a new fuel-saving PBCF ECO CAP, without drydocking the vessel.
The modification delivered a reported 5% improvement in fuel efficiency, allowing the shipowner to benefit from reduced fuel consumption and lower emissions as soon as the vessel returned to operation.
This project demonstrates how specialized underwater propeller modifications can be carried out during a scheduled port call, avoiding unnecessary drydock costs and extended vessel downtime.
Project Overview - PBCF ECO CAP Replacement in Tarragona
The vessel’s operator wanted to improve propulsion efficiency and reduce fuel consumption by upgrading the existing propeller boss cap.
Instead of scheduling the work during a future drydock, the shipowner selected FN Diving to perform the complete replacement underwater in Tarragona.
The assignment required the removal of the existing propeller boss cap and the installation of a new Propeller Boss Cap Fins system, commonly known as a PBCF, PBCF or ECO CAP.
The project was organized from our Rotterdam headquarters, with the diving team travelling to Spain and the required materials and specialized underwater equipment mobilized separately.
Project details
- Location: Port of Tarragona, Spain
- Contractor: FN Diving
- Service: Underwater PBCF / PBCF ECO CAP installation
- Scope: Removal of existing propeller boss cap and installation of new ECO CAP
- Mobilization: Personnel, equipment and materials from Rotterdam, Netherlands
- Execution time: Within 48 hours
- Drydocking: Not required
- Fuel efficiency improvement: 5% reported for the customer
- Vessel downtime: Minimized through underwater installation
Rapid Mobilization from Rotterdam to Tarragona
International underwater propeller repairs require careful planning, particularly when the work must be completed within a limited port stay.
For this project, FN Diving coordinated the complete mobilization from Rotterdam.
Our experienced commercial diving team flew to Spain, while the necessary installation materials, underwater tools and technical equipment were prepared and transported from our Rotterdam facilities.
By organizing the operation in advance, our team could begin work shortly after arrival in Tarragona.
This type of rapid international mobilization is an important part of FN Diving’s services. We regularly support shipowners and technical managers who require specialized underwater repairs outside their normal operating area.
With operational facilities in Rotterdam and Algeciras, FN Diving provides underwater inspection, repair and installation services throughout Europe.
Removing the Existing Propeller Boss Cap Underwater
The first stage of the operation involved removing the vessel’s existing propeller boss cap.
Our diving team accessed the propeller hub underwater and prepared the existing cap for removal.
The removal required careful handling of the mounting arrangement to avoid damage to the propeller hub and surrounding components.
Once the original boss cap had been removed, the mounting surfaces and fitting arrangement were inspected and prepared for the replacement ECO CAP.
Correct preparation is essential for this type of installation. The new cap must fit the existing propeller arrangement accurately and remain securely mounted during vessel operation.
Installing the New PBCF ECO CAP Underwater
With the existing cap removed and the propeller hub prepared, our divers proceeded with the installation of the new PBCF ECO CAP.
The replacement unit was positioned underwater and fitted directly onto the propeller hub using specialized installation equipment.
The installation required accurate alignment and secure attachment of the new cap.
Following installation, the completed arrangement was inspected underwater to verify the positioning and general condition of the assembly.
The entire operation was completed within 48 hours, without removing the vessel from the water.
The vessel could return to normal commercial operations with the upgraded propeller configuration, avoiding the time and expense associated with drydocking.
How Does a PBCF ECO CAP Improve Propeller Efficiency?
A conventional marine propeller produces a rotating flow behind the propeller hub, commonly referred to as the propeller hub vortex.
This vortex represents a loss of energy that does not contribute effectively to the vessel’s forward propulsion.
A Propeller Boss Cap Fins system is designed to modify the flow behind the propeller hub, reducing vortex-related energy losses and improving overall propulsive efficiency.
The fins integrated into the ECO CAP influence the water flow leaving the propeller, helping reduce wasted energy.
Depending on the vessel’s propeller design, operating speed, loading conditions and propulsion characteristics, a correctly designed PBCF system can contribute to measurable fuel savings.
For shipowners operating vessels with significant annual fuel consumption, even relatively small efficiency improvements can result in substantial operational savings.
5% Fuel Efficiency Improvement for the Shipowner
The main objective of this project was to reduce fuel consumption through improved propeller efficiency.
Following the underwater ECO CAP installation in Tarragona, the customer reported an improvement in fuel efficiency of approximately 5%.
For a commercial vessel, this represents a potentially significant reduction in annual fuel expenditure.
A vessel consuming 20 metric tonnes of fuel per day, for example, could theoretically save approximately one tonne of fuel per operating day with a 5% reduction in consumption.
Over 300 operating days, this would represent approximately 300 tonnes of fuel saved annually, assuming comparable operating conditions.
The actual financial benefit depends on fuel prices, operating profile, vessel loading and annual sailing days.
In addition to reducing operating costs, lower fuel consumption also contributes to reduced CO₂ emissions.
The advantage of underwater installation is that these savings can begin immediately after the vessel returns to service, rather than waiting for the next scheduled drydock.
Custom PBCF ECO CAP Design and Manufacturing by FN Diving
In addition to underwater installation and replacement, FN Diving can also provide in-house design and manufacturing of customized PBCF / PBCF ECO CAP systems.
Every vessel has its own propeller geometry, hub dimensions and operating characteristics. A suitable ECO CAP must therefore be designed around the specific propulsion arrangement.
FN Diving can support shipowners with the complete process, from evaluating the existing propeller configuration to developing and manufacturing a replacement cap suitable for underwater installation.
Our capabilities include:
- Assessment of existing propeller boss cap arrangements
- Custom PBCF / PBCF ECO CAP design
- In-house manufacturing of customized propeller boss caps
- Preparation of mounting and installation arrangements
- Underwater removal of existing propeller boss caps
- Underwater installation of new PBCF ECO CAP systems
- Final underwater inspection and installation documentation
By combining design, manufacturing and underwater installation, FN Diving can provide a complete solution for shipowners looking to improve propulsion efficiency.
Our engineering and manufacturing capabilities will be covered in more detail in a separate technical article.
Underwater PBCF ECO CAP Installation Without Drydocking
Traditional propeller modifications are often scheduled during drydock periods, when the vessel is taken out of service for maintenance.
However, many propeller boss cap replacements can be carried out underwater when the existing mounting arrangement, vessel conditions and installation requirements allow it.
Underwater PBCF installation offers several operational advantages.
Reduced vessel downtime
The modification can be performed during a suitable port call, reducing the need for additional off-hire time.
No dedicated drydock required
The vessel does not need to enter drydock solely for the ECO CAP replacement.
Faster implementation of fuel-saving modifications
Shipowners can introduce efficiency improvements without waiting months for the next scheduled maintenance period.
International mobilization
FN Diving can mobilize experienced diving teams and specialized equipment to ports throughout Europe.
Complete technical support
From preparation and removal to installation and final underwater inspection, the operation is handled by an experienced commercial diving team.
The Tarragona project demonstrates how these advantages can be combined in a single, efficiently executed operation.
Planning an underwater PBCF ECO CAP installation or propeller efficiency upgrade? Contact FN Diving to discuss your project and discover how we can help reduce fuel consumption without drydocking.